Performing inspection / maintenance
4. Close the ball valve after no more test
liquid comes out. Coil up the hose and
place it back in the CTU.
Owing to its design, the level
sensor in the reservoir does cover the
bottom. As a result, the CTU software
will still show a content of 1 liter.
5. Put the drain ball valve into the
"Operation" position.
6.
CTU 1xx0
- Fit the right paneling back
into place.
CTU 1xx1
- Fit the left side paneling
back into place.
Reconnect the ground bond wire.
Insert the side paneling into the lower
guide with both pins and then press them
against the CTU. Close the two locks by
turning them 90° in the clockwise
direction using the four-sided hollow key.