Preparing the CTU for operation
Connecting the CTU
Checking connections and contacts
DANGER
Electric shock
Danger of fatal injury
►
Any work involving the power supply may only
be done by a properly trained, certified
electrician.
►
Pull the power plug before performing work on
live parts.
On delivery, the CTU has been pre-installed. Before starting it up, please
check the following:
Remove the transport fixings in the control cabinet.
Keep the box containing the software licenses and operating and
maintenance instructions near the CTU.
Carefully read the operating and maintenance instructions for the CTU as
well as the CTU software operating instructions.
Using the following illustration of the X2 terminal strip, check that resistors
R1, R2, R3, R4 & R5 are all fitted correctly.
During transport, resistors may have come undone from the terminal strip
and may be lying loose at the bottom of the switch cabinet.
Put the monitor and the keyboard on the CTU.
Check and connect the power and signal/data cables as shown in the
following illustrations.
CTU 1000 Series
en(us)
Page 25 / 92
BeWa CTU1000 3229578p en-us 2017-04-25.doc
2017-04-25