Field Application Department
2018 . 10 . 02 (r1)
16/63
[Adjust the APP1 value for PD(APPL) LED]
※ The HNT Calibration JIG of 30mmHg should be used
2. After that, you should check the appl1_val and adjust this if necessary
: Match the z-ratio to “0.00” -->
APPL_VAL: 600~950
- Adjust the VR7 on the Mainboard (Clockwise: increase)
- Engineer Setup Mode → ③ Focus Led Setup → ⑥ Adjust the PD(APPL) LED
※ You have to check the Psd_Anode0/1 after adjusting the PD(APPL) LED
5) How to adjust the LED brightness
[HNT-1/1P] Auto Tracking issue_PD(APPL) LED
VR7