MK/MV – Medium Profile Series Unit Coolers (E206993_M)
10
4.3
EVACUATION AND LEAK TEST
When all refrigeration connections have been completed, the entire system must be tested for leaks and
then evacuated. Refer to the instructions provided with your compressor system for information on
performing the leak test and evacuation.
4.4
MK HOT GAS DEFROST PIPING
Figure 4 (H) HGE - 3 PIPE HOT GAS COIL WITH ELECTRIC DRAIN PAN DEFROST PIPING
Figure 5 (G) HGG - 3 PIPE HOT GAS COIL WITH HOT GAS DRAIN PAN DEFROST PIPING