D
C
A
B
E
15
S
ET
U
P
THREADING THE UPPER THREAD
0DNHVXUHWKHSUHVVHUIRRWLVUDLVHGDQGWKHQHHGOHLVLQWKHXS
position
Press the ON/OFF switch to “O”.
1. Place the thread on the spool pin and the spool cap on the
spool pin as described on page 14.
2.
Spool pin in horizontal position:
%ULQJWKHWKUHDGRYHUDQGEHKLQGWKH
pre-tension thread
JXLGH$DQGXQGHUWKHWKUHDGJXLGH%
S
pool pin in vertical position:
Instead of bringing the thread into the pre-tension guide
$EULQJLWGLUHFWO\XQGHUWKHWKUHDGJXLGH%
%ULQJWKHWKUHDGGRZQEHWZHHQWKH
thread tension discs
&
4. Continue threading in the direction indicated by the
DUURZV%ULQJWKHWKUHDGIURPWKHULJKWLQWRWKHVORWRQWKH
WDNHXSOHYHU'
7DNHWKHWKUHDGGRZQDQGEHKLQGWKHODVWJXLGHMXVWDERYH
WKHQHHGOH(