
M.37
NUDA 900 2012/2013 - NUDA 900 R 2012/2013
H06526
H10523
2
1
1
H10524
3
2
Workshop Manual Ed. 11-2011
ELECTRICAL SYSTEM
Semiconductor parts
• Be careful to never drop parts that incorporate a semiconductor, such as
the ECU or the voltage regulator/rectifier.
• Closely follow the relevant instructions when inspecting these parts. An
improper procedure may lead to severe damage.
Relay removal
- Remove the filter box cover as described in the relevant paragraph.
- Loosen the two screws (1) and lift the relay support (2).
- Remove the connectors from the relays (3) and remove the relays slipping
them off upwards.
Summary of Contents for NUDA 900 2012
Page 1: ...NUDA 900 2012 2013 NUDA 900 R 2012 2013 Workshop Manual Ed 11 2011 Rev 02 ...
Page 6: ......
Page 18: ......
Page 19: ...B 1 NUDA 900 2012 2013 NUDA 900 R 2012 2013 B Workshop Manual Ed 11 2011 MAINTENANCE Section ...
Page 22: ......
Page 32: ......
Page 60: ......
Page 146: ......
Page 162: ......
Page 186: ......
Page 210: ......
Page 284: ...M 4 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 286: ......
Page 290: ...M 10 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 342: ......
Page 350: ......