
F1.28
NUDA 900 2012/2013 - NUDA 900 R 2012/2013
H10447
1
2
H10448
1
2
H10432
7
10
1
3
9
6
5
4
2
11
8
GENERAL ENGINE PROCEDURES
Workshop Manual Ed. 11-2011
- Tighten the screws to torque, referring to the installation sequence (from 1
to 11).
- Refit the oil sump as described in the relevant paragraph.
OIL PRESSURE ADJUSTMENT VALVE CHECK/REPLACEMENT
Removal:
- Remove the swing arm cover as described in the relevant paragraph.
- Disassemble the oil pressure valve (1) with the spring (2).
- Check the condition of the valve.
- Insert the valve in the cover and activate it a few times to check spring elas-
ticity.
- If the valve does not function properly, it must be replaced.
- Check that the seat of the oil delivery valve is not dirty, and clean it if neces-
sary.
- Clean the valve seat.
Installation:
- Insert the oil pressure valve (1) together with the spring (2) in the cover and
check its operation manually.
- Refit the swing arm cover as described in the relevant paragraph.
Summary of Contents for NUDA 900 2012
Page 1: ...NUDA 900 2012 2013 NUDA 900 R 2012 2013 Workshop Manual Ed 11 2011 Rev 02 ...
Page 6: ......
Page 18: ......
Page 19: ...B 1 NUDA 900 2012 2013 NUDA 900 R 2012 2013 B Workshop Manual Ed 11 2011 MAINTENANCE Section ...
Page 22: ......
Page 32: ......
Page 60: ......
Page 146: ......
Page 162: ......
Page 186: ......
Page 210: ......
Page 284: ...M 4 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 286: ......
Page 290: ...M 10 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 342: ......
Page 350: ......