
F3.16
NUDA 900 2012/2013 - NUDA 900 R 2012/2013
H10396
1
3
2
3
3
3
H10397
8
5
6
7
4
1
2
3
H10398
1
2
H10399
CRANKCASE DISASSEMBLY
Workshop Manual Ed. 11-2011
Main bearing cap installation
- Clean and lubricate all support surfaces.
- Fit the caps (2), making sure the reference pins (3) are correctly positioned.
- Pay attention to the installation position marks.
- Tighten the screws (1) to torque according to the indicated sequence (from
1 to 8), then perform the final tightening as specified in the relevant chapter.
The screws must be replaced at each reassembly.
Connecting rod cap installation
- Clean and lubricate the contact surfaces of the connecting rod and the con-
necting rod caps.
- Lubricate the sliding surfaces with engine oil.
- Fit the caps (2) on the connecting rods, paying attention to the marks (ar-
rows).
- Replace the screws (1) and tighten them to torque on the connecting rod caps,
alternating them, then perform final tightening as specified in the relevant
chapter.
The screws must be replaced at each reassembly.
Summary of Contents for NUDA 900 2012
Page 1: ...NUDA 900 2012 2013 NUDA 900 R 2012 2013 Workshop Manual Ed 11 2011 Rev 02 ...
Page 6: ......
Page 18: ......
Page 19: ...B 1 NUDA 900 2012 2013 NUDA 900 R 2012 2013 B Workshop Manual Ed 11 2011 MAINTENANCE Section ...
Page 22: ......
Page 32: ......
Page 60: ......
Page 146: ......
Page 162: ......
Page 186: ......
Page 210: ......
Page 284: ...M 4 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 286: ......
Page 290: ...M 10 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 342: ......
Page 350: ......