7
HANDLEBAR,CONTROLS
43
7.4
Checkin the throttle cable routin
7.5
Preparatory work
-
Remove the seat. (.- p. 80)
-
Remove the fuel tank. (.- p. 80)
Main work
-
Check the throttle cable routing.
Both throttle cables must be routed to the throttle valve body side by side
behind the handlebars and above the fuel tank bracket.
If the throttle cable is not routed as specified:
Correct the throttle cable routing.
Finishing work
-
Install the fuel tank.(.- p. 81)
-
Mount the seat. (.- p. 80)
-
Check the throttle grip for smooth operation.
-
Move the handlebar to the straight-ahead position. Turn the throttle grip back and
forth slightly and determine the play in throttle cable
G.
I
Play in throttle cable
13 ...
5 mm (0.12 ... 0.2 in)
If the throttle cable play does not meet specifications:
- Adjust the play in the throttle cable. (.- p. 44)
Danger
Danger of poisoning
Exhaust gases are toxic and inhaling them may
result in unconsciousness and/or death.
-
When running the engine, always make sure there is sufficient ventila
tion, and do not start or run the engine in an enclosed space without
an effective exhaust extraction system.
-
Start the engine and let it run idle. Move the handlebar to and fro over the entire
steering range.
I
The idle speed must not change.
If the idle speed changes:
- Adjust the play in the throttle cable. (.- p. 44)
Summary of Contents for FC 350 2014
Page 1: ...PIONEERING SINCE 1903 REPAIR MANUAL2014 FC 350 EU Art no 3403006en Husqvarna MOTORCYCLES ...
Page 2: ......
Page 90: ...12 FUEL TANK SEAT TRIM Start the motor and check the response 88 ...
Page 192: ...18 CLUTCH 190 Position the cover with the membrane Mount and tighten the screws ...
Page 236: ...30 SPECIAL TOOLS 234 Nitro en filling tool Art no T170S1 2x 3x T170S1 H00855 01 ...