17 ENGINE
17.5.22 Installing the cylinder head
G00485-11
-
Position cylinder head gasket
Q.
•
Info
I
Ensure that the dowel pins are seated properly.
-
Put the cylinder head in place.
-
Mount nuts @ with the washers and tighten in a crisscross pattern.
Guideline
180
Nut, cylinder head
M10x1 .25
Tightening
Thread, oiled with
I
Graduated disc (60029010000) (� p. 223)
-
Mount and tighten nut
8.
Guideline
Nut, cylinder head
M6
sequence:
Tighten diag-
onally.
1st tightening
stage
10 Nm
(7.4 lbf ft)
2nd tighten-
ing stage
30 Nm
(22.1 lbf ft)
3rd tightening
stage
50 Nm
(36.9 lbf ft)
10 Nm
(7.4 lbf ft)
engine oil/cone
greased
Lubricated with
engine oil
Summary of Contents for FC 350 2014
Page 1: ...PIONEERING SINCE 1903 REPAIR MANUAL2014 FC 350 EU Art no 3403006en Husqvarna MOTORCYCLES ...
Page 2: ......
Page 90: ...12 FUEL TANK SEAT TRIM Start the motor and check the response 88 ...
Page 192: ...18 CLUTCH 190 Position the cover with the membrane Mount and tighten the screws ...
Page 236: ...30 SPECIAL TOOLS 234 Nitro en filling tool Art no T170S1 2x 3x T170S1 H00855 01 ...