42
Incremental Encoder FG 41
10 Checklist
We recommend that you print out and work through the checklist for commissioning, when
replacing the measuring system and when changing the parameterization of a previously
accepted system, sign it and store it as part of the overall system documentation.
Documentation reason
Date
Edited
Checked
Sub-item
To note
Can be found under
Yes
Present user manual has been read and understood.
Document no.:
FG41_Manual-en_R0
o
Check that the
measuring system
can be used for the
preset automation
task on the basis of
the specified safety
requirements
·
Intended use
·
Safety functions of the fail-safe
processing unit
·
Compliance with all technical data
·
Chapter 2.3
Intended use
on page 11
·
Chapter 2.5
Safety functions of the fail-
safe processing unit
on page 12
·
Chapter 4
Technical Data on page 18
o
Fulfillment of the
installation
requirements defined
in the user manual
·
Safe mechanical fixing of the measuring
system and safe positive connection of
the driving shaft with the measuring
system
·
Chapter 5
Assembly on page 24
o
Requirement for the
power supply
·
The power supply unit used must meet
the requirements of
SELV/PELV
(IEC 60364-4-41:2005+A1:2017)
·
Chapter 4.2
Electrical characteristics
on page 19
·
Chapter 6.2
EMC requirements
on page 31
o
Correct electrical
installation
(shielding)
·
Observance of basic rules for
installation
·
Observance of wiring standards
·
Chapter 6
Installation / Preparation for
Commissioning
on page 30
System test after
commissioning and
modifications
·
During commissioning and after each
parameter change all affected safety
functions must be checked.
·
Chapter 2.5
Safety functions of the fail-
safe processing unit
on page 12
o
Device replacement
·
It must be ensured that the new device
corresponds to the replaced device.
·
All affected safety functions must be
checked.
·
Chapter 9
Replacing the Measuring
System
on page 41
o