Step 10
Confirm the replacement.
1.
Perform a post-replacement inspection.
After the parts replacement, return to the SmartKit page and click
Replaced
. Then
complete the check after the replacement as prompted.
2.
Check system status.
On the
Parts Replacement
page, click
Inspection
to check the system status again. If
any inspection item fails, rectify the fault based on the suggestions in the inspection
report.
3.
After the preceding procedure is complete, check services on the host for any storage-
related error.
----End
Follow-up Procedure
After the power module is replaced, label it to facilitate subsequent operations.
5.8.3 Replacing a Power Module (for Dorado18000 V3)
This section describes how to replace a power module.
Impact on the System
During the replacement of a power module, if the redundant power module fails, the
corresponding controller is powered by a BBU and the system reliability degrades.
Prerequisites
l
The spare part is ready.
l
The power module that you want to replace has been located.
NOTE
You can locate a component in either of the following ways:
l
Locating a component based on alarms in DeviceManager: On the
Alarms and Events
page of
DeviceManager, view the help information and locate the component to be replaced.
l
Locating a component based on the status of its alarm indicator: For details about the indicators on
different components, see indicator introduction in the
Product Description
specific to your product.
l
The other power module works properly.
Precautions
l
Do not touch the connectors of a power module and a power cable.
l
Remove and insert a power module with even force. Excessive force may damage the
appearance or connectors of the power module.
l
Remove only one power module at a time.
l
A power module must be replaced within five minutes. Otherwise, the system heat
dissipation is compromised.
OceanStor Dorado V3 Series
Parts Replacement
5 Replacing FRUs
Issue 05 (2019-01-30)
Copyright © Huawei Technologies Co., Ltd.
145