UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 02 (2017-02-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
73
Figure 3-31
Removing the cable covers from the top of the cabinet
Drill holes for routing cables.
Remove the cable cover for signal cables from the cabinet, and drill holes on the middle
large cover based on the number and diameter of cables, as shown in
Remove the cover and then drill holes. If holes are drilled for routing cables, attach grommet strips to
the hole edges to protect cables.