UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
5 Operations
Issue 02 (2017-02-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
225
The UPS is working in normal mode; float charging or hibernation has lasted for 2 hours
after the state of charge (SOC) reaches 100%; and the load ratio fluctuation is less than
10%.
The UPS has generated no battery overtemperature, overvoltage, or overcurrent alarm. No
generator is connected to the UPS.
The mains, batteries, charger, and discharger are normal. No overload alarm is generated.
Procedure
Step 1
On the main screen of the LCD, tap
System Info
. Tap
. The
Maintenance
screen is
displayed.
Step 2
(Optional) If no user is logged in, enter a user name and a password, and then tap
.
For details about default user names, preset passwords, and user rights, see
If an incorrect password is entered three consecutive times, the account will be logged out for 5
minutes.
Step 3
On the
Maintenance
screen, tap
Battery Maint.
, as shown in
Step 4
Tap
Start
next to
Capacity Test
to start a capacity test, as shown in
Figure 5-27
Starting a capacity test
Tap
Stop
next to
Capacity Test
in any of the following cases:
The battery discharge voltage reaches the end of discharge (EOD) voltage plus 0.01 V.
The load fluctuation exceeds 10%.
An alarm is generated.
When the battery discharge voltage reaches the EOD voltage plus 0.01 V, the test is complete. The test
data is used as capacity test data. Save the capacity test data record with the largest discharge capacity in
a month as the capacity test data for the month. A maximum of recent 36 capacity test records can be
saved.
----End