
About This Document
Purpose
This document describes the process of installing a DC blade RRU3262 (referred to as RRU in
this document).
Product Versions
The following table lists the product versions related to this document.
Product Name
Solution Version
Product Version
DBS3900
l
SRAN8.0 and later
versions
l
eRAN6.0 and later
versions
V100R008C00 and later
versions
Intended Audience
This document is intended for:
Base station installation engineers
Organization
1 Changes in RRU3262 Installation Guide
This section describes the changes in the RRU3262 Installation Guide.
This chapter describes the reference documents, tools, and instruments that must be ready before
the installation. In addition, it specifies the skills and prerequisites that installation engineers
must have.
3 Information About the Installation
Before installing an RRU, you must be familiar with its exterior, ports, indicators, installation
options and installation clearance requirements.
RRU3262
Installation Guide
About This Document
Issue 01 (2014-11-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
ii