Contents
1.1 Hardware Architecture the NE80E.....................................................................................................................2
1.2 Cabinet Introduction...........................................................................................................................................3
2.1.1 Preparing Technical Documents................................................................................................................6
2.1.2 Preparing Tools and Meters.......................................................................................................................6
2.1.3 Qualification of Installation Engineers......................................................................................................7
2.2.1 Checking the Equipment Room Structure.................................................................................................8
2.2.2 Checking the Equipment Room Conditions..............................................................................................8
2.2.3 Checking the Power Supply Condition of the Equipment Room..............................................................9
2.2.4 Checking the Grounding............................................................................................................................9
2.2.5 Checking the Other Facilities..................................................................................................................10
2.3.1 Checking the Package Container.............................................................................................................11
2.3.2 Unpacking the Wooden Case..................................................................................................................12
2.3.3 Unpacking the Carton..............................................................................................................................16
3.1 Cable Assembly Precautions............................................................................................................................20
3.2 Assembling Power Cables................................................................................................................................21
3.2.1 Assembling the OT Terminal and Power Cable......................................................................................21
3.2.2 Assembling the JG Terminal and Power Cable.......................................................................................24
3.2.3 Assembling the Cord End Terminal and the Power Cable......................................................................27
3.3.1 Assembling the Shielded RJ45 Connector and Ethernet Cable...............................................................30
3.3.2 Assembling an Unshielded RJ45 Connector and Ethernet Cable............................................................36
3.3.3 Checking the Appearance of Contact Strips............................................................................................38
3.3.4 Testing the Connection of Assembled Cables.........................................................................................40
HUAWEI NetEngine80E Router
Installation Guide
Contents
Issue 02 (2011-09-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
iv