No.
Check Item and Description
Method
7
The boards can be plugged and removed
smoothly. Screws on the board panels,
if any, are fastened properly. The steel
wires on the screws are intact.
-
8
The surfaces of the device are clean and
tidy. No component of the cabinet is
deformed. Otherwise, it will affect the
appearance of the entire device. All
labels are correct, clear, and complete.
-
9
The cabinet is clean and there are no
dust particles inside the cabinet. There
are no extra bundling straps, cable ends,
or other foreign objects inside the
cabinet.
-
10
The electrostatic discharge (ESD)-
preventive wrist strap is inserted into the
ESD-preventive hole on the cabinet.
Check this according to the following
figure.
11
Blank filler panels are installed in all
empty slots.
-
5.1.2 Cable Installation Checklist
This section provides a checklist for checking the installed cables.
Power Cables and Grounding Cables
lists the items that need to be checked for the installed power cables and grounding
cables.