PDU8000 Modular Precision PDC V2.0
User Manual
4 Acceptance Guide
Issue 03 (2018-01-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
29
Unpacking
Step 1
Move the PDC to the specified installation position using a forklift.
Step 2
Cut off and remove the binding straps.
Figure 4-1
Removing the binding straps
Step 3
Remove the packing materials and foam.
Step 4
Remove the plastic bag, take out the fitting box, and put it away.
----End