PDU8000 Modular Precision PDC V2.0
User Manual
5 Installation Guide
Issue 03 (2018-01-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
42
5.3.3 Installing the PDC on an ESD Floor
Context
A support is required when the PDC is installed on an ESD floor. The support height depends
on the height between the ground and the ESD floor.
Procedure
Step 1
Lower the leveling feet of the PDC using an adjustable wrench until all castors are off the
ground and the cabinet is level.
Step 2
Lift the PDC onto the support and align the mounting holes in the PDC with those in the
support.
Step 3
Level the PDC by adjusting the leveling feet.
Figure 5-10
Leveling PDC
(1) Leveling foot
(2) Level
Step 4
Insert four M12 bolts into the mounting holes in the PDC and support, and partially tighten
the bolts.
Scenario 1
Figure 5-11
Securing the cabinet
Scenario 2