ii.
Use a Phillips screwdriver to tighten the four screws (marked 2 in the label) in
the middle of the heat sink in a diagonal sequence. See (2) in
Figure 4-38
Installing the heat sink
Step 14
Check whether a PCIe card is installed.
l
If yes, go to
.
l
Step 15
Install the PCIe card.
Step 16
Install the air duct.
Step 17
Install the cover.
Step 18
Install the compute node.
.
Step 19
Power on the compute node.
----End
4.3.15 Removing a Memory Module
Removing a memory module
Step 1
Power off the compute node.
FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
4 Parts Replacement
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
85