Step 6
Lift the left and right air ducts.
Figure 3-12
Removing the air ducts
Step 7
Place the removed component in an ESD bag.
----End
3.8 Installing the Air Duct
Procedure
Step 1
Power off the compute node.
Step 2
Remove the compute node.
Step 3
Place the compute node on the ESD workstation.
Step 4
Remove the cover.
.
Step 5
Take the spare part out of its ESD bag.
Step 6
Determine the position of the air duct.
Step 7
Check whether a PCIe card is installed.
l
If yes, go to
.
l
Step 8
Transform the air duct.
FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
3 Basic Operations
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
19