42
6 Routing Cables
6.6 Connecting Power Cables(AC+RPR Power Supply)
Loose captive screws to remove the cover.
Use fiber patch cords to connect exchange
side terminal blocks and cable side terminal
blocks. For details about the connections, see
“Diagram of Cable Connections Between the
RPS and MDF”.
Lead the RPS power cable (copper cable)
into the cabinet, connect the PGND cable in
the power cable to the ground bar in the
cabinet, and the rest of the wires to the
device compartment of the cabinet.
Ground bar
Cable side terminal block
Exchange side terminal
block
Cable side
terminal block
Exchange side
terminal block
Summary of Contents for F01T500
Page 1: ...HUAWEI TECHNOLOGIES CO LTD F01T500 Quick Installation Guide Issue 07 Date 2017 05 03 ...
Page 19: ...With battery cabinet 4 Installing the Cabinet on a Concrete Pedestal 14 ...
Page 23: ...18 Unit mm 4 Installing the Cabinet on a Concrete Pedestal ...
Page 25: ...20 4 Installing the Cabinet on a Concrete Pedestal ...
Page 27: ...22 4 Installing the Cabinet on a Concrete Pedestal ...
Page 38: ...33 With power meter box ...
Page 40: ...35 With power meter box AC power cables AC power cables ...
Page 44: ...39 6 Routing Cables 6 3 Diagram of Cable Connections Between the RPS and MDF RPS Power Supply ...
Page 51: ...46 Route the input Cables of the AC RPR power supply 6 Routing Cables ...
Page 83: ...14 FAQs for Installation 78 ...