
Figure 3-6
Networking diagram of configuring sub-interfaces for dot1q VLAN tag termination
to support BFD
MPLS/IP
backbone
RouterC
GE1/0/0
192.168.2.1/24
GE1/0/0
192.168.2.2/24
GE1/0/0
192.168.1.1/24
GE2/0/0
192.168.1.2/24
GE2/0/0.1
100.1.1.1/24
GE2/0/0.1
100.1.1.2/24
GE1/0/1
GE1/0/2
VLAN10
Host 100.1.1.3/24
BFD session
RouterB
RouterA
GE1/0/0
Switch
Configuration Roadmap
The configuration roadmap is as follows:
1.
Configure an IGP to ensure connectivity between Router A, Router B, and Router C.
2.
Configure the Layer 2 forwarding function on the switch.
3.
Configure interface modes on Router A and Router B as user termination.
4.
Configure sub-interfaces for dot1q VLAN tag termination on Router A and Router B.
5.
Configure a BFD session on Router A and Router B to detect the link between Router A
and Router B.
6.
Configure VRRP backup group 1 on GE 2/0/0.1 of Router A and GE 2/0/0.1 of Router B.
Router A functions as a master device and Router B functions as a backup device.
Data Preparation
To complete the configuration, you need the following data:
Huawei AR2200-S Series Enterprise Routers
Configuration Guide - Reliability
3 BFD Configuration
Issue 01 (2012-01-06)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
183