12
Isolation Base Installation into SXRC Frame
- Uncrate each of the isolation
bases. Make sure you read and follow all of the instructions in the isolation base
manual prior to installing into the SXRC Audio Stand frame. You will want to
verify that the frame size matches the isolation base size. The SXRC-1921-2 uses
the 1921-2 isolation bases. The SXRC-2029-2 uses the 2029-2 isolation bases,
and so on.
Match the load range of each isolation base with the component weight. Matching
the isolation base to the proper component weight will ensure optimum
performance. The load range can be changed for a nominal factory fee so if you
do not have the correct load range for a component, please contact Harmonic
Resolution Systems or your local certified retail location to arrange to have this
corrected.
Load the Isolation Bases into the SXRC frame with the HRS logo facing the front
of the rack system. Picture 12 shows this in an SXR-3V system. Be sure that the
isolation base (shelf) feet are located securely in the pocket of the SXRC Support
Brace. This will automatically occur when the front and back edge of the isolation
base is in line with the front and back face of the frame. If the front and back
edges do not line up with the front and back of the frame structure then, contact
Harmonic Resolution Systems or your certified retail location because you may
not have the proper size isolation base or frame.
Picture 12
Completed SXR-1921-3V shown with M3X Isolation Bases.