10. Close the input connector cover.
11. Remove the output connector cover from the new power supply.
12. Insert the power supply into the frame until it locks into place. The power supply is marked with TOP to ensure proper orientation
during installation.
13. Connect the power cables to the -48V DC power source.
14. Turn on or enable the -48V DC power source.
15. Verify that the power supply LED is green.
Replacing the –48V DC power supply
76
Summary of Contents for Synergy 12000 Frame
Page 36: ...Customer self repair 36...
Page 37: ...Customer self repair 37...
Page 38: ...Customer self repair 38...
Page 39: ...Customer self repair 39...
Page 40: ...Removal and replacement procedures Removal and replacement procedures 40...
Page 53: ...HPE Synergy Console connections HPE Synergy Console connections 53...
Page 78: ...To replace the component reverse the removal procedure Removing and replacing a rear cage 78...
Page 82: ...Component and LED identification Component and LED identification 82...
Page 84: ...Information pull tabs 84...
Page 88: ...Figure 5 Optional horizontal half shelf Device bay partitions 88...
Page 92: ...Appliance bay numbering Appliance bay numbering 92...
Page 131: ...Specifications Specifications 131...
Page 134: ...Support and other resources Support and other resources 134...