Replacing the –48V DC power supply
Replacing the –48V DC power supply
Procedure
Procedure
1. Ensure that a ground connection to the HPE Synergy 12000 Frame has been properly installed according to the HPE Synergy 12000
Frame Ground Bond Assembly Installation Instructions.
2. Place the power supply on a flat surface.
3. Open the input connector on the new power supply by lifting the input connector cover.
4. Insert the two-hole lug through the aperture labeled –48V
–48V on the power supply input connector.
5. Secure the two-hole lug to the -48V DC input connector terminal with two T25 screws.
6. Using a torque-controlled T25 screwdriver, tighten both screws to 15lb-in of torque.
7. Insert the two-hole lug through the aperture labeled "RTN" on the power supply input connector.
8. Secure the two-hole lug to the RTN input connector terminal with two T25 screws.
9. Using a torque-controlled T25 screwdriver, tighten both screws to 15lb-in of torque.
Replacing the –48V DC power supply
75
Summary of Contents for Synergy 12000 Frame
Page 36: ...Customer self repair 36...
Page 37: ...Customer self repair 37...
Page 38: ...Customer self repair 38...
Page 39: ...Customer self repair 39...
Page 40: ...Removal and replacement procedures Removal and replacement procedures 40...
Page 53: ...HPE Synergy Console connections HPE Synergy Console connections 53...
Page 78: ...To replace the component reverse the removal procedure Removing and replacing a rear cage 78...
Page 82: ...Component and LED identification Component and LED identification 82...
Page 84: ...Information pull tabs 84...
Page 88: ...Figure 5 Optional horizontal half shelf Device bay partitions 88...
Page 92: ...Appliance bay numbering Appliance bay numbering 92...
Page 131: ...Specifications Specifications 131...
Page 134: ...Support and other resources Support and other resources 134...