13.
Install the processor mezzanine tray (
Installing a processor mezzanine tray
14.
Install the air baffle (
on page 41).
CAUTION:
To avoid damaging the connectors, always install the air baffle into the server before installing the
riser cages.
15.
Install the primary PCIe riser cage (
Installing the primary PCIe riser cage
16.
Install the butterfly PCIe riser cage (
Installing a butterfly PCIe riser cage
on page 80).
17.
Install the fan cage (
on page 43).
18.
Install the access panel (
on page 37).
19.
Install the server into the rack (
Installing the server into the rack
20.
Connect each power cord to the server.
21.
Connect each power cord to the power source.
on page 32.
Installing an eight-bay SFF HDD/SSD drive cage
The eight-bay SFF HDD/SSD drive cage can be installed in any drive box in the server. For more information,
see
on page 7.
Prerequisites
Before installing this option, be sure that you have the following:
• T-10 Torx screwdriver
• The components included with the hardware option kit
58