Removing and replacing an energy pack
Procedure
1.
If installed,
.
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
•
Extend the server from the rack
.
•
Remove the server from the rack
6.
Disconnect the energy pack cable from the system board.
7.
Remove the energy pack.
To replace the component, reverse the removal procedure.