9.
Disconnect existing drive power cable.
10. Connect the NVMe signal and power cables
.
.
14. Install the server into the rack
.
15.
Connect all peripheral cables to the server.
16.
Connect each power cord to the server.
17.
Connect each power cord to the power source.
19.
If removed,
The installation is complete.
Installing the 8 to 12 upgrade option in the LFF chassis
The 8 LFF chassis can be upgraded to 12 LFF chassis with this option installed. This option cannot be
installed when the NVMe drive cage is installed in the box 1.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• T-10 Torx screwdriver
• Flat-headed screwdriver
Hardware options installation
67
Summary of Contents for ProLiant DL180
Page 30: ...24 bay SFF hot plug drive model Fan bay numbering 30 Component identification...
Page 58: ...SFF 4 Install the drive LFF SFF 58 Hardware options installation...
Page 97: ...Secondary riser cage Slot 4 Slot 5 or 6 Hardware options installation 97...
Page 128: ...Box 2 to type a controller Box 2 to type p controller 128 Cabling...
Page 129: ...Box 3 to system board Box 3 to type a controller Cabling 129...
Page 130: ...Box 3 to type p controller 8 bay SFF power cable default 130 Cabling...
Page 135: ...Mini SAS cable to SAS expander Cabling 135...
Page 137: ...M 2 SSD enablement board installed in secondary riser Cabling 137...
Page 142: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 142 Cabling...
Page 144: ...Secondary riser cage Slot 4 Slot 5 or 6 144 Cabling...