background image

27 

 

 

Villa Series Installation

 

 

 

 

 

 

 

A shut off valve is needs to installed before line is connected to oven and make sure all gas connections are 

checked for leaks 

 

Connect  gas line to back of the oven 

6

. Turn electronic ignition on, pilot will 

spark for 30-60 seconds till it lights, 
then turn gas control knob to regulate 
flame. 

7

. Turn electronic 

ignition to off 

position. You’ve 

completed the 

installation.   

Connect gas to oven  

         

 

 

 

 

 

            

3. Place oven on top of the 

hearth’s carbon fiber 

gasket.   

4. Connect gas line to back of oven 
check for leaks (Natural Gas from 
house) all gas connections should 
follow proper code requirements  

5. Lift front of oven till it rests on back of the hearth and remove 
back wooden board first. Then remove front board placing oven 
on its final location 

Summary of Contents for EI Series

Page 1: ...VILLA FORNO AND Di NAPOLI SIGNITURE SERIES EISeries On Off Models Installation OperationInstructions Hearth Products Controls 860 EION OFF...

Page 2: ...ll not be stored in the vicinity of this or any other appliance DANGER FIRE OR EXPLOSION HAZARD If you smell gas Shut off gas to the appliance Extinguish an open flame If odor continues leave the area...

Page 3: ...3...

Page 4: ...r End Users 8 2 RemoteLPTankSystemEnclosureRequirements IfApplicable 9 3 Lighting the Oven 13 4 First Firing 15 5 Forno Series Installation 16 6 Battery Requirements Battery or DC Adaptor 22 7 Villa S...

Page 5: ...void Never alter product or configuration in any way Annual servicing should be handled by professionals certified in the US by the National Fireplace Institute NFI as NFI Gas Specialists orinCanadab...

Page 6: ...is is a Safety Alert Symbol When you see this symbol on the fire pit insert or in this manual look for one of the following signal word panels alerting you to the potential for personal injury death o...

Page 7: ...onsibility of the installer to follow TheNationalFuelGasCode ANSIZ223 1 NFPA54orInternationalFuel GasCode Natural Gas and Propane Installation Code CSA B149 1 or CSA B149 2 TheNationalElectricalCode A...

Page 8: ...from hot oven NEVER leave the oven unattended while it is in use It is your responsibility to assemble and store operate and care for your gas oven properly Do not vent propane vapors from the cylind...

Page 9: ...ng s shallhaveatotalfree area of not less than 1 in2 lb 14 2 cm2 kg of stored fuel capacity See Figure6 1 Ventilationopening s shallbeprovidedatthe floor level of the enclosure and shall have a total...

Page 10: ...der valves is acceptable provided it is non locking and can be opened without the use of tools Designs using a cover to gain access to the cylinder and cylinder valve shall be provided with handles or...

Page 11: ...tor and hose assembly provided with this appliance or replacement pressure regulators and hose assemblies as specified by the manufacturer The regulator supplies a pressure of 11 inches water column t...

Page 12: ...r plug from the cylinder fuel valve 3 Insert the black QCC1 regulator nipple onto the QCC1 fuel valve and tighten until snug Do not use tools 4 Perform a leak test on all joints prior to using the gas...

Page 13: ...nk to pilot the first time you start your oven Once pilot is lit turn the gas control knob from OFF position slowly to regulate burner flame Turn gas regulator knob to OFF and place small pieces of dr...

Page 14: ...thermometer if you want to do more detailed temperature control like breads and chicken We suggest baking bread in the front of the oven where the temperature is around 300 400 We suggest smoking afte...

Page 15: ...d it goes through a drying process that allows water to evaporate Glass is mortared using a proprietary formula that will withstand the high heat generated during normal operation In order to properly...

Page 16: ...16 FornoSeriesInstallation Cart Hearth Oven Preparation...

Page 17: ...Hybrid Oven s transporting kit 1 Remove gas line from under hearth 3 Unscrew 4 pins from top of oven Make sure those pins are replaced when oven is reassembled when oven 4 Place wood in front of pilot...

Page 18: ...location 7 Place cart to desired location 5 Two people transfer oven to sturdy location Prior to re assembly 8 Place hearth on top of cart Tighten 3 underneath screws then re install gas regulator mak...

Page 19: ...to on and control heat intensity 13 Turn knob to off position You ve completed the installation 9 Place oven on top of hearth Carefully Remove bungee cords 10 Place oven in desired location carefully...

Page 20: ...eck for leaks Follow how to start the oven instructions Natural Gas needs to be connected here The installation of this appliance must conform with local codes or in the absence of local codes with ei...

Page 21: ...nd the inside of door opening The Oven Vent enables you to use the door and burn wood and use gas while door closes the opening like your oven at home You may control the heat by regulating the flame...

Page 22: ...ase follow built in instruction requirement picture for location of 110v 15 amp GFCI outlet Outlet should be located on left side of oven base minimum 12 18 inches from oven s hearth You must follow a...

Page 23: ...ttom Minimum opening width has to be 33 1 2 inches Maximum opening width has to be 33 3 4 inches Support is needed on each side of the counter 1 inches from rough opening locking tabs from phalange ne...

Page 24: ...aSeriesInstallation 1 inches from side support so locking clips can hold flange in place Side support countertop Flange with locking clips Placement of side support for counter and flange with locking...

Page 25: ...rm the installation Always have two to three people to install the oven The Villa Series installed weighs approx 400lbs Please make sure the counter cutout has support on each side where the oven will...

Page 26: ...plate For concrete counters with more than 1 thickness a slit has to be made on concrete counter to accommodate for fastening brackets A place flange in opening B then mark with pencil location for sl...

Page 27: ...turn gas control knob to regulate flame 7 Turn electronic ignition to off position You ve completed the installation Connect gas to oven 3 Place oven on top of the hearth s carbon fiber gasket 4 Conne...

Page 28: ...mbustible material HEARTH Rear elevation of cabinet 36 minimum cabinet 34 cabinet notch 1 2 h cabinet cutout 3x18 inch Vent is required on back of cabinet Half inch above cabinet shelf WARNING LP tank...

Page 29: ...view 24 deep cabinet countertop countertop 32 deep opening 34 deep countertop minimum 12 overhang to front of cabinet Stainless flange Hearth to back wall distance requirement Combustible 2 inches Non...

Page 30: ...n hearth plate Make sure all the connections are tight and comply with local codes Turn gas shut off valve on and check for leaks Follow how to start the oven instructions Natural Gas needs to be conn...

Page 31: ...D VENTILATION AIR TO THE APPLIANCE ELECTRICAL AND GAS REQUIREMENTS ARE SPECIFIED FOR PROPER INSTALLATION AND USE OF OVEN INSTALLATION MUST CONFORM WITH LOCAL CODES OR IN THE ABSENCE OF LOCAL CODES WIT...

Page 32: ...ason built base requirements 2 Front Rear bearing construction Top 11 1 2 inches from front of hearth to finished face 32 inches from finished face finished face to accommodate stone brick stucco Mini...

Page 33: ...33 DiNapoliSeriesInstallation...

Page 34: ...ven The installation of this appliance must conform with local codes or in the absence of local codes with either the National Fuel code ANSI Z223 1 NFPA54 National Gas propane Installation code CSA B...

Page 35: ...calculate the chimney s outside diameter add 2 inches to the inside diameter CHIMNEY HEIGHT The National Fire Protection Association Standard 211 states Chimneys shall extend at least three feet above...

Page 36: ...on concrete base for hearth installation Flush countertop with top of hearth Hearth sits on at least 1 inches of support wall Base may also be constructed of steel framing to accommodate your weight...

Page 37: ...ly 2 DD battery or 120 V adaptor with 15amp service GAS Supply Liquid propane 10 WC Natural gas 7 WC Inlet 3 8 NPT female 33 3 8 18 3 24 6 diameter Refractory arch Front View Simple construction Top V...

Page 38: ...e follows requirements for electric and gas hook up 34 48 inches width Bottom of oven has to be kept unobstructed oven cannot be set on a continuous solid countertop 2 Once base is complete set oven h...

Page 39: ...n either be constructed of steel studs or concrete block Material used has to be non combustible Proper chimney configuration should be used according to your enclosure design and according to Dura Te...

Page 40: ...ll arched front to cement board using mortar Install desired finished stone to cement board For longer lasting finish make sure all joints are taped with proper fiber mesh tape Stone is applied to cem...

Page 41: ...41 DiNapoliSeriesInstallation 5 Once stone is installed install desired roof material And don t forget a chimney cap of choice...

Page 42: ...ural gas pilot will not ignite If there is more than one appliance using gas at a time pressure to oven might be diminished Debris in pilot Ashes or spider webs can obstruct pilot not allowing it to f...

Page 43: ...43 WiringDiagram OPTIONAL AC ADAPTOR AC outlet requires constant 120VAC to the 3V adapter These brown wires control the ON OFF switch that operates the Oven...

Page 44: ...t cover the improper use of gas and subsequent explosion or poisoning due to gas exposure Acts of God such as fire flood hurricanes and tornadoes HPC Hybrid Oven s two year warranty only applies for t...

Page 45: ...45 2021 Hearth Products Controls 03 04 Hearth Products Controls 2225 Lyons Road Miamisburg OH 45342 For detailed product information go to www hpcfire com...

Reviews: