Hardware options installation 69
3.
Extend the server from the rack (on page
25
).
4.
Remove the SPI board (on page
28
).
5.
Locate the TPM connector ("
SPI board components
" on page
15
).
CAUTION:
Any attempt to remove an installed TPM from the system board breaks or disfigures
the TPM security rivet. Upon locating a broken or disfigured rivet on an installed TPM,
administrators should consider the system compromised and take appropriate measures to ensure
the integrity of the system data.
6.
Install the TPM board. Press down on the connector to seat the board.
7.
Install the TPM security rivet by pressing the rivet firmly into the system board.
8.
Install the SPI board.
9.
Install the access panel (on page
27
).
10.
Slide the server back into the rack.
11.
Power up the server (on page
25
).
Summary of Contents for ProLiant DL585 G7
Page 18: ...Component identification 18 Secondary processor memory board Device numbers ...
Page 23: ...Component identification 23 Fan locations Power supply backplane components ...
Page 71: ...Cabling 71 Cabling DVD ROM drive cabling ...
Page 92: ...Troubleshooting 92 ...
Page 108: ...Regulatory compliance notices 108 Taiwan notices ...
Page 117: ...Support and other resources 117 ...
Page 118: ...Support and other resources 118 ...