Setup 33
WARNING:
To reduce the risk of personal injury or damage to the equipment, be sure that:
•
The leveling jacks are extended to the floor.
•
The full weight of the rack rests on the leveling jacks.
•
The stabilizing feet are attached to the rack if it is a single-rack installation.
•
The racks are coupled together in multiple-rack installations.
•
Only one component is extended at a time. A rack may become unstable if more than one
component is extended for any reason.
WARNING:
To reduce the risk of personal injury or equipment damage when unloading a rack:
•
At least two people are needed to safely unload the rack from the pallet. An empty 42U rack
can weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft) tall, and might
become unstable when being moved on its casters.
•
Never stand in front of the rack when it is rolling down the ramp from the pallet. Always handle
the rack from both sides.
Identifying the contents of the server shipping carton
Unpack the server shipping carton and locate the materials and documentation necessary for installing the
server. All the rack mounting hardware necessary for installing the server into the rack is included with the
rack or the server.
The contents of the server shipping carton include:
•
Server
•
Power cord
•
Hardware documentation, Documentation CD, and software products
•
Rack-mounting hardware
In addition to the supplied items, you might need:
•
Operating system or application software
•
Hardware options
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
35
)."
Installing the server into the rack
Refer to the installation instructions that ship with the rack kit to install the server into the rack.
Powering up and configuring the server
To power up the server, press the Power On/Standby button.
While the server boots, RBSU and the ORCA utility are automatically configured to prepare the server for
operating system installation.
Summary of Contents for ProLiant DL585 G7
Page 18: ...Component identification 18 Secondary processor memory board Device numbers ...
Page 23: ...Component identification 23 Fan locations Power supply backplane components ...
Page 71: ...Cabling 71 Cabling DVD ROM drive cabling ...
Page 92: ...Troubleshooting 92 ...
Page 108: ...Regulatory compliance notices 108 Taiwan notices ...
Page 117: ...Support and other resources 117 ...
Page 118: ...Support and other resources 118 ...