Hardware options installation 53
2.
Slide the power supply into the power supply bay until the device locks into place.
3.
Connect the power cord to the power supply.
4.
Connect the power cord to the power source.
5.
Be sure that the power supply LED is green ("
Power supply LED
" on page
12
).
6.
Be sure that the front panel external health LED is green.
Internal solid state drive expansion bay option
1.
Power down the server (on page
25
).
2.
Extend the server from the rack (on page
25
).
3.
Remove the access panel (on page
26
).
4.
Remove the SPI board (on page
28
).
5.
Install the solid state drive.
6.
Connect the cable.
Summary of Contents for ProLiant DL585 G7
Page 18: ...Component identification 18 Secondary processor memory board Device numbers ...
Page 23: ...Component identification 23 Fan locations Power supply backplane components ...
Page 71: ...Cabling 71 Cabling DVD ROM drive cabling ...
Page 92: ...Troubleshooting 92 ...
Page 108: ...Regulatory compliance notices 108 Taiwan notices ...
Page 117: ...Support and other resources 117 ...
Page 118: ...Support and other resources 118 ...