
Chapter 6
Replacing Parts
84
Tool
Latch
Installing a Second Processor
This section provides the instructions for installing a second processor and its heatsink on the system board.
CAUTION
A processor can be damaged by static electricity. Take the following precautions:
•
Leave the processor in the anti-static bag until you are ready to install it.
•
Wear an anti-static wrist strap and use a static-dissipating work surface or
grounding mat connected to the chassis when handling components.
•
Before removing a processor from the anti-static bag, touch a grounded,
unpainted metal surface to discharge static electricity.
1. Unpack the processor shipping box and check the contents against the packing list.
CAUTION
Do not unseal the anti-static bag, or remove the processor until you are ready to
install it.
2. Log off all users and backup files. Shut down the NOS according to the instructions in your NOS
documentation.
3. Press the power switch on the HP Netserver control panel when prompted by the operating
system.
Normally, this completes the shutdown procedure.
WARNING
Power supplies continue to provide standby current to the Netserver until the power
is disconnected.
4. Disconnect the AC power cord.