![HP D5970A - NetServer - LCII Installation Manual Download Page 86](http://html.mh-extra.com/html/hp/d5970a-netserver-lcii/d5970a-netserver-lcii_installation-manual_155580086.webp)
Chapter 7
Installing Additional Processors
78
Left Processor
Carrier Board
Right Processor
Carrier Board
Left Processor
Module Slots
Left Cache
Coherency Filter
Right Cache
Coherency Filter
J6A1
Right Processor
Module Slots
1
2
3
4
1
2
3
4
Figure 7-1. Processor Baseboard
The processor modules are installed into the unused slots on the processor carrier
boards as needed and all empty slots on both processor carrier boards must have a
terminator installed. See Tables 7-1 and 7-2 and "Processor Configuration
Guidelines" earlier in this chapter for the order of processor placement.
4-Way Configuration
The four-way configuration shown in Figure 7-2 is the minimum standard
configuration shipped and is provided with:
l
1 Processor Module (min)
l
7 Terminators (3 in left carrier and 4 in right carrier)
l
2 Processor Carrier Boards
Both cache coherency filters are installed on the 4-way configuration. All four
slots on the right processor carrier board require terminations.