Procedure 1: Prepare to Install the Hub
23
In
s
ta
lla
tio
n
Procedure 1: Prepare to Install the Hub
Before installing the hub:
•
Complete site-required arrangements for the hub.
•
Make sure electrical power and temperature control requirements are met.
•
Define a strategy for integrating the hub into an existing loop.
•
Draw a map of all nodes to be connected to the hub.
Summary of Contents for A3724A - SureStore E Hub S10
Page 1: ...Hewlett Packard SureStore E Hub Models S10 and L10 Service and User Manual ...
Page 2: ......
Page 8: ...6 Regulatory Statements 110 Laser Safety 113 Glossary 117 Index 121 ...
Page 12: ...10 ...
Page 68: ...66 Viewing Hub Information ...
Page 86: ...84 If Firmware Upgrade Appears to Fail ...
Page 114: ...112 Regulatory Statements E VCCI Statement Japan ...
Page 118: ...116 Laser Safety Declaration of Conformity ...
Page 122: ...120 Glossary ...
Page 130: ...128 Index ...
Page 133: ......