106
Operating Requirements
If both ends of the Fibre Channel cable are between the limits listed in step 5, the two
long-wave hub’s are verified for cascading up to 10 km using this cable plant. If the meter
readings are not within range, verify that the Fibre Channel cable is securely connected to
the hub’s long-wave port. Also verify, that the cable connectors are clean by wiping them
with a lint-free cloth dampened with reagent grade isopropyl alcohol and blowing the
connectors dry with clean, compressed air.
Summary of Contents for A3724A - SureStore E Hub S10
Page 1: ...Hewlett Packard SureStore E Hub Models S10 and L10 Service and User Manual ...
Page 2: ......
Page 8: ...6 Regulatory Statements 110 Laser Safety 113 Glossary 117 Index 121 ...
Page 12: ...10 ...
Page 68: ...66 Viewing Hub Information ...
Page 86: ...84 If Firmware Upgrade Appears to Fail ...
Page 114: ...112 Regulatory Statements E VCCI Statement Japan ...
Page 118: ...116 Laser Safety Declaration of Conformity ...
Page 122: ...120 Glossary ...
Page 130: ...128 Index ...
Page 133: ......