17
4 214 283 / 00
ASSEMBLY
2.7
Mounting the cladding and boiler control
Max-3 plus
(1500-2700)
7.
Mount the right side walls (8,9,10, Fig. 21) to the top longitudinal strutting and the boiler plinth rail.
-
Mount in order of position number
8.
Mount the left side walls (1
1,12,13) (to the top longitudinal strutting an the boiler plinth rail).
9.
10.
Route the burner cable (17) with the burner plug (17a) trough the prepared drill-holer in the side walls,
then attach the cable route with the collar (17b) to the side wall.
11
.
Mount the supporting plate (18, Fig. 18) into the side panel.
12.
Remove control box cover plate (19, Fig. 21).
The control panel (18a, Fig. 19) must be turned. For
this purpose the pressure lock sleeves (18b, compress and pull away) as well as the earth screw and
serrated lock washer (18d) must be removed. Fix special screws (18f, Fig. 18) with locknut at sup-
porting plate (18). Position the control box (18e) with the cut-outs for special screws to the supporting
x 6,5mm
and serrated lock washers (18c). Plug in bu-
connector (18g, Fig. 21) at electrical box.
13.
Pull capillaries with the immersion sensors (19a, Fig. 20) through the opening (19, Fig. 18), push into
Attention: The capillaries must not be kinked!
14.
Fix the control box cover (19, Fig. 21) with self-tapping screws
ø
3,5 x 6,5mm
and serrated lock washers.
15.
Mount cladding cover (20,21,22,23,24).
16.
Fix bolts (25) with nuts and u-washers to the boiler door
, then mount door cladding (25a, 25b).
Fig.
18
18e
1
8c
18
19
12f
18f
18c
180°
18d
18c
18b
18e
18a
Fig.
19
Fig.
20
19c
19a
rner