
EN
Master Language is English
Hot Runner System Installation Guide
SVC-17-0001_EN-Rev13
RESTRICTED: Property of Synventive.
- 595 -
All rights reserved. Errors and omissions excepted
For limited third party distribution based on need and intended use.
© 2021 Synventive Molding Solutions
H O T R U N N E R T E C H N O L O G Y
Hot Runner System Installation Guide
Service and Maintenance / Disassembly the Nozzle 16S-06 / 22S-0S Series
7) Loosen the indexing plungers (T4.4), by turning the button
90°.
8) Position the disassembly tool until the indexing plungers (T4.4)
smaps into the hole of the cover tube (7) and the heater (5).
9) Turn the hexagon head screw (T4.6) clockwise.
NOTICE
By turning the hexagon head screw (T4.6) the
heater (5) together with the cover tube (7) is pulled
of the nozzle body (1).
10) Turn down the hexagon head (T4.6) completely.
11) Remove the front heater (5).
12) Remove the cover tube (7).
Doc008808_RIS.png
Doc008809_RIS.png