16
[c] SEQUENCE
1st Cycle
1. Unit energized and Control Switch to “ICE”
position. Water supply cycle starts.
IMPORTANT
Water Valve
opening is limited
to 6 minutes.
5. After the first 5 minutes in freeze cycle.
Ready to complete freeze cycle when Float
Switch circuit opens.
4. Defrost Timer stops counting.
Defrost cycle is completed and freeze cycle
starts.
IMPORTANT
Board never accepts freeze completion signal
within the first 5 minutes in freeze cycle.
IMPORTANT
1. Board never accepts defrost completion
signal within the first 2 minutes in defrost
cycle.
2. Defrost cycle time is limited to 20 minutes
even if Defrost Timer does not stop counting.
3. Thermistor reads 48° F (9°C).
Defrost Timer, adjustable from
1 to 3 minutes, starts counting.
2. After 1 minute,
Defrost cycle starts.
Summary of Contents for KM-150BAF
Page 5: ...5 I SPECIFICATIONS 1 KM 150BAF ...
Page 6: ...6 2 KM 150BWF ...
Page 7: ...7 II GENERAL INFORMATION 1 CONSTRUCTION a KM 150BAF ...
Page 8: ...8 b KM 150BWF ...
Page 14: ...14 Control Products HOSHIZAKI001 Board ...
Page 15: ...15 Control Products HOS 001A Board ...
Page 23: ...23 TEST PROGRAM OF ALPINE CONTROLLER BOARD ...
Page 25: ...25 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERANT CIRCUIT a KM 150BAF ...
Page 26: ...26 b KM 150BWF ...
Page 30: ...30 4 PERFORMANCE DATA a KM 150BAF Air cooled ...
Page 31: ...31 b KM 150BWF Water cooled ...