49
14. REMOVAL AND REPLACEMENT OF FLOAT SWITCH
1) Go through the steps 1) through 7) in “13. REMOVAL AND REPLACEMENT OF
PUMP MOTOR.”
2) Remove the connectors of the Float Switch.
3) Remove the screw and the Float Switch Bracket.
4) Remove the two screws and the Float Switch.
5) Take off the Hose sleeving the Float Switch leads.
6) Sleeve the leads of the new Float Switch with the Hose.
7) Install the new Float Switch, and replace the removed parts in the reverse order of
which they were removed.
8) Go through the steps 12) through 14) in “13. REMOVAL AND REPLACEMENT OF
PUMP MOTOR.”
15. REMOVAL AND REPLACEMENT OF SPRAY TUBE
1) Turn off the power supply, and unplug the icemaker.
2) Remove the Top Panel and Top Insulation.
3) Disconnect the Hoses.
4) Lift off the Spray Tube.
5) Install the new Spray Tube.
Note: Place the Spray Tube so that the holding tabs on both sides are in position.
6) Connect the Hoses.
7) Replace the Top Insulation and Top Panel in their correct positions.
8) Plug in the icemaker, and turn on the power supply.
12) Close the Bin Door.
13) Replace the panels in their correct positions.
14) Plug in the icemaker, and turn on the power supply.
Summary of Contents for KM-150BAF
Page 5: ...5 I SPECIFICATIONS 1 KM 150BAF ...
Page 6: ...6 2 KM 150BWF ...
Page 7: ...7 II GENERAL INFORMATION 1 CONSTRUCTION a KM 150BAF ...
Page 8: ...8 b KM 150BWF ...
Page 14: ...14 Control Products HOSHIZAKI001 Board ...
Page 15: ...15 Control Products HOS 001A Board ...
Page 23: ...23 TEST PROGRAM OF ALPINE CONTROLLER BOARD ...
Page 25: ...25 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERANT CIRCUIT a KM 150BAF ...
Page 26: ...26 b KM 150BWF ...
Page 30: ...30 4 PERFORMANCE DATA a KM 150BAF Air cooled ...
Page 31: ...31 b KM 150BWF Water cooled ...