Pre-emergence markers
WARNING
Danger of injury
¾
Make sure before operating the pre-emer-
gence marker that no persons are present in
the danger zone.
The pre-emergence markers mark the tram
lines before the seed grows. They can also be
subsequently mounted to the coulter brackets.
The coulter brackets are hydraulically lifted and
electrically activated by the tram line control
system.
The cutting angle of the coulter discs can be
adjusted to suit the soil conditions and the re-
quested marker depth by rotating the disc angle.
¾
Simply release the bracket and rotate the
four-cornered shaft until the requested coulter
disc angle is attained. Marking should not take
place deeper than necessary.
¾
Then tighten the screws again.
Pre-emergence marker - adapting the marker depth
Depth setting
The pre-emergence markers can be adjusted
in 4 stages:
•
Stage 1 - flattest position
•
Stage 4 - deepest position
1
4
.......
2
1
3
1
2
3
4
Pre-emergence marker set to stage 1.
¾
Loosen the cotter pin (1).
¾
Set the desired stage (3) by turning the han-
dle (2).
¾
Secure with cotter pin.
¾
Set the same stage on both pre-emergence
markers.
¾
Check the marking when starting work and
regularly during work in the field.
62
63