background image

MANUFACTURED BY:

THE FEEDER LEADER

COMPANY LTD

2 Miro St – PO Box 1282, Taupo 3351
Phone New Z64 (0)7 378 4533

operators manual

‘THE BOSS’

FEEDER LEADER RANGE

‘THE BOSS’

3 PTL

Original

‘THE BOSS’

3 PTL

Feedlot

Feeder

‘THE BOSS’

Trailed 2 Bale Feeder

Summary of Contents for BOSS 3 PTL Original

Page 1: ...EEDER LEADER COMPANY LTD 2 Miro St PO Box 1282 Taupo 3351 Phone New Zealand 64 0 7 378 4533 operators manual THE BOSS FEEDER LEADER RANGE THE BOSS 3 PTL Original THE BOSS 3 PTL Feedlot Feeder THE BOSS Trailed 2 Bale Feeder ...

Page 2: ... Ltd will not be liable for alteration to their goods as a result of such changes h Components such as hydraulic control valves hydraulic rams and divertors These are supplied subject to the warranty given by their manufacturers 4 Procedure for recovery under warranty No loss or damage will be covered under warranty unless the following procedure is followed by the purchaser a If the purchaser is ...

Page 3: ...stem before repairing adjusting or disconnecting Keep all lines fitting and couplers tight and free of leaks Wear proper hands and eye protection when searching for leaks Use wood or cardboard instead of hands Do not use hydraulic lines for hand holds or steps Components may be hot APC 003 Operating the Feeder Leader involves several safe work practices which are also noted in the machinery risk a...

Page 4: ...ving the bale in the cradle Now drive around to the front of the fork and reverse back into the bale cradle The RH tine is longer so that only one tine has to be lined up with hole in cradle when picking it up With the RH side lined up the LH will automatically follow Ensure that the latch is engaged before driving off FEEDING OUT Check to see which way the bale is rolled by engaging the Feeder Le...

Page 5: ...ly do not worry the machine will draw the bale in properly when you begin to feed out The second bale can be picked up and carried on the cradle behind the first When the first bale has been fed out load the nest with the forks You may have to lower the forks with the bale on them to ground level again and then in one movement lift it an put it into the feeder You can carry a bale on your front en...

Page 6: ...3 Chain joiner link not shown 1 14 Chain joiner link not shown 1 15 Steel sprockets 2 16 17 18 19 20 M12 X 100 8 21 M10 nut 4 22 M10 X30 4 23 M10 X12 grub screws 4 11 12 23 9 8 2 7 2 3 4 5 1 20 21 22 10 Parts for the Boss range including the original pictured Feedlot Feeder and Trailed Feeder are the same Parts for our older model ie drive pins are still available call or email for information 15 ...

Page 7: ...mber to fill in and return the Warranty Registration form on the back page of this manual Warranty is VOID if this registration is not received by The Feeder Leader Company Ltd within 28 days of the delivery of the machine ...

Page 8: ...______________________________________________________ Installation Date ____________________________________________________________ FEEDER LEADER OTHER SERIAL NO MODEL I confirm that I have received and read an Operator s Manual in particular the conditions from page one of this manual dealing with Damage caused by accident misuse or abuse Warranty 3c Use outside of normal operating conditions a...

Reviews:

Related manuals for BOSS 3 PTL Original