2. Platform Installation
2.6. Install air duct baffles and blank front panels in cabinet
12/2007
PE SC1430-Based Honeywell Server PE SC1430-Based Honeywell Server
39
Release Independent
Honeywell
Step
Action
6
Go to Section 2.7, Starting up your Server, to complete the installation.
2.6 Install air duct baffles and blank front panels in
cabinet
Use the following procedure to install the air duct baffle and blank front panels in the
cabinet. These are available in four height options, refer to Table 2-3 for height options.
Installing these parts will insure that the airflow within the cabinet allows proper cooling
of the computers.