2. Platform Installation
2.7. Starting up your Server
12/2007
PE SC1430-Based Honeywell Server PE SC1430-Based Honeywell Server
41
Release Independent
Honeywell
Step
Action
nuts and tighten the screws.
4
Attach the rear mounting bracket to the rear cabinet rail using two thread
forming screws and two external tooth washers and tighten the screws.
5
Attach the air duct baffle to the rear mounting bracket using two machine
screws and two external tooth washers threaded into the two self clinching
nuts. Tighten the screws.
2.7 Starting up your Server
Overview
The following table lists those tasks that must be performed prior to operating your
server platform. This section contains procedures for each of these tasks.
Note: Cabinet mounted servers that do not have a KVM switch/console require the
connection of the USB mouse and keyboard (supplied with the server) for server startup.
Task
Turn on power and check status.
Check LCNP4M status.
Turn on power and check status
Step
Action
1
Press the power button on the front panel.
2
Wait for the power light to become solid green.
3
If the power light does not become solid green, refer to the
“Advanced
Troubleshooting” section of the Dell Precision™ PE SC1430 System User's
Guide.
Check LCNP4M status
If this is a TPS node with the LCNP4M board installed, verify that the LCNP4M passed
self test.
Step
Action
1
From the
Start
menu, go to Programs>Honeywell TPS, select
LCNP4M
Status
.
2
Verify that the LCNP4M status indicates
Passed Self Test
and the circle is
green.