Homa Flut - Set Original Instruction Manual Download Page 23

EngliSH | 23

Before further switch-on the switch pauses according to 
the technical data must be complied with. In the event 
of a further interference the machine must be switched 
off immediately. A further switch-on process may only be 
started after recovery of the fault.

The following points should be checked:

• 

Switching frequency and pauses (see technical data)

• 

Minimum submersion in water, level control, protec-
tion against dry run

• 

Smooth run Check for leakages, if appropriate take 
the necessary steps according the chapter ‘mainte-
nance’

6. Maintenance

6.1. General

The pump as well as the entire system must be inspec-
ted and maintained at regular intervals. The interval of 
the maintenance is determined by the manufacturer and 
applies for the general conditions of use. The manufac-
turer must be contacted in the event of aggressive and/
or abrasive pumped mediums, since the interval could be 
shortened in these cases.

The following points must be noted:

• 

The operating instructions must be available to the 
maintenance personnel and must be followed. Only 
maintenance work and measures listed here must be 
carried out.

• 

All maintenance work, inspection work and cleaning 
work on the machinery and the system must be car-
ried out with due diligence, at a safe working place 
and by trained qualified personnel. The required pro-
tective gear must be worn. The machinery must be 
disconnected from the power supply for all work. 
Unintentional start must be prevented. Furthermore 
the respective protective measures according to the 
Employers’ Liability Association regulations, BGV/the 
Statutory Accident insurance, GUV must be complied 
with when working in basins and/or containers.

Ensure that sling gear, ropes and the safety equipment 
of the hand winch are technically sound. The work 
must only be started when the auxiliary hoisting gear 
is technically in order. Failure to carry out these checks 
may jeopardize your life!

• 

easily inflammable dissolvers and cleaning materials 
are used, open fire, open light as well as smoking are 
prohibited.

• 

Ensure that the required tools and materials are rea-
dily available. Tidiness and cleanness ensure safe and 
proper work on the machinery. Remove used clea-
ning materials and tools from the machinery after 
the work has been carried out. Keep all materials and 
tools in a dedicated place.

• 

Service media (such as for example oils, lubricants, 
etc.) must be captured in a suitable container and 
must be disposed of according to the regulation 
75/439/EEC and writ §5a, 5b abfG, Waste Avoidan-
ce and Management Act). Respective protective clo-
thing must be worn when carrying out cleaning work 
and maintenance work. This must be disposed of ac-
cording to waste catalogue TA 524 02 and EC directi-
ve 91/689/EEC. Only lubricants recommended by the 
manufacturer must be used. Oils and lubricants must 
not be mixed. Only use manufacturer’s original parts. 

A test run or function test of the machinery must only 
be carried out according to the general operating 

 

conditions!

6.2. Maintenance schedule

Every six months:
• 

Visual inspection of the power supply leads

• 

Visual inspection of the cable holders and the wiring

• 

Visual inspection of accessories, such as for example 
suspension device, lifting devices, etc.

6.3. Maintenance work

Visual inspection of the power supply leads

The power inlet leads must be inspected for bubbles, 
cracks, scratches, scour marks and/or crushing zones. 
If damages are detected, the damaged power inlet lead 
must be replaced immediately.

The leads may only be replaced by the manufacturer 
or an authorized/certified service workshop. The ma-
chinery must only be started after appropriate repair 
of the damage!

Visual inspection of the cable holders (biners) and the 
wiring (traction cable)

If the machine is used in basins/shafts the hoisting wires/
cable holders (biners) and the wiring are subject to con-
stant wear and tear. Regular inspections are required to 
prevent a complete wear and tear of the hoisting wires/
cable holders (biners) and/or wiring and a complete dam-
age to the power cable.

The hoisting wires/cable holders (biners) and the wir-
ing must be replaced immediately if there are slight 
signs of tear and wear!

Visual inspection of accessories

The accessories, such as for example suspension 

 

devices, lifting devices, etc. must be checked for correct 
fitting. Loose or defective accessories must be repaired/
replaced immediately.

Summary of Contents for Flut - Set

Page 1: ...Original Betriebsanleitung EN Original Instruction Manual NL Originele handleiding Flut Set...

Page 2: ...d berwachungseinrichtungen 08 2 8 F rdermedien 08 2 9 Schalldruck 08 3 Allgemeine Beschreibung 09 3 1 Verwendung 09 3 2 Einsatzarten 09 3 3 Aufbau 09 4 Verpackung Transport und Lagerung 10 4 1 Anliefe...

Page 3: ...eits bestimmungen sowie die Herstellerangaben zu erf llen Diese Betriebsanleitung erg nzt und oder erweitert die bestehenden nationalen Vorschriften zum Unfallschutz und zur Unfallverh tung Diese Betr...

Page 4: ...er schweren Verletzun gen von Personen f hren 1 5 3 Wartung Die vorgeschriebenen Wartungs und Inspektionsarbeiten sind regelm ig durchzuf hren und d rfen nur von qualifi zierten und autorisierten Pers...

Page 5: ...usteuerung soll die Pumpe bei verschiedenen F llst nden automatisch ein bzw ausschalten Erre icht wird dies durch den Einbau von einem Niveauer fassungssystem 2 Sicherheit Dieses Kapitel f hrt alle ge...

Page 6: ...e Schutzvorrichtung abgeschaltet wurde darf diese erst nach der Behebung des Fehlers wieder eingeschaltet werden Gefahr durch elektrischen Strom Durch unsachgem en Umgang mit Strom bei elek trischen A...

Page 7: ...mit einer Schmier bzw K hl fl ssigkeit z B l betrieben werden kann diese bei einer defekten Gleitringdichtung in das F rdermedi um gelangen Gefahr durch explosive Medien Das F rdern von explosiven Med...

Page 8: ...d kommen las sen Motork hlung Durch den K hlmantel mit obenliegendem Druckan schluss ist eine ausreichende Motork hlung gegeben 3 3 3 Laufrad Das Laufrad ist auf der Motorwelle befestigt und wird von...

Page 9: ...rneuert Warnung vor scharfen Kanten An Laufr dern und Propellern k nnen sich scharfe Kanten bilden Es besteht Verletzungsgefahr Tragen Sie zum Schutz geeignete Handschuhe Nach einer l ngeren Lagerung...

Page 10: ...endung separater Schwimmer f r Pump en Start Pumpen Stopp und Alarm sind die Schalt niveaus wie oben zu w hlen Der Alarmschwimmer sollte ca 10 cm oberhalb des Pumpen Einschaltpunk tes schalten jedoch...

Page 11: ...iebsmedien z B le Schmierstoffe usw sind in geeigneten Beh lter aufzufangen und vorschrifts m ig zu entsorgen gem Richtlinie 75 439 EWG und Erlasse gem 5a 5b AbfG Bei Reinigungs und Wartungsarbeiten i...

Page 12: ...Maschine vom Stromnetz tren nen ausbauen und einlagern F r die Einlagerung ist fol gendes zu beachten Warnung vor hei en Teilen Achten Sie beim Ausbau der Maschine auf die Tem peratur der Geh useteil...

Page 13: ...schen Pumpe saugt sich am flexiblem Boden fest Stellen sie die Pumpe auf einen festen Untergrund Maschine l uft die angegebenen Betriebswerte werden nicht eingehalten Ursache Abhilfe Zulauf verstopft...

Page 14: ...Pumped fluids 21 2 9 Sound Pressure 21 3 General Description 21 3 1 Use 21 3 2 Type of application 21 3 3 Construction 21 4 Package Transport Storage 23 4 1 Delivery 23 4 2 Transport 23 4 3 Storage 23...

Page 15: ...tion This manual must also be accessible to personnel at all times and also be made available where the product is used 1 3 Proper use The HOMA products comply with the valid safety regu lations and m...

Page 16: ...plied must be properly up dated This enables you to monitor the status of inspec tions and maintenance work Quick repairs not listed in this operation and maintenance manual and all types of repair wo...

Page 17: ...ntling maintenance installation The machine must be dis connected from the electrical system and secured against being switched on again All rotating parts must be at a standstill The operator should...

Page 18: ...sult in fatal injury This work may only be carried out by a qualified electrician Beware of damp Moisture penetrating cables can damage them and render them useless Furthermore water can penetrate int...

Page 19: ...oducts are not designed for these liquids 2 9 Sound Pressure Depending on the size and power kW the pump has a sound pressure of about 40dB A to 70dB A during operation However the actual sound pressu...

Page 20: ...ble inlets as well as the circuit are sealed resistant to jet water towards the pumped medi um The shaft bearing is carried out by means of robust maintenance free and permanently lubricated antifrict...

Page 21: ...e storage to prevent impurities The power supply cables should be protected against kinking damage and moisture Beware of electrical current Damaged power supply cables can cause fatal in jury Defecti...

Page 22: ...edge of the pump casing so that no air pockets can develop in the pump which requires under circumstances de aerating of the pump Under no circumstances the float with the cable must be thrown into t...

Page 23: ...ea dily available Tidiness and cleanness ensure safe and proper work on the machinery Remove used clea ning materials and tools from the machinery after the work has been carried out Keep all material...

Page 24: ...arts When removing the machine be careful of the tem perature of the housing components These can heat up to well above 40 C Let the machine cool down to ambient temperature before you touch it Clean...

Page 25: ...exible ground Move the pump on hard ground The machinery is running the indicated operating values are not met Cause Remedy Inlet obstructed Clean inlet gate valve suction piece suction branch suction...

Page 26: ...2 8 Vloeistoffen 35 2 9 Geluidsdruk 35 3 Algemene beschrijving 35 3 1 Toepassing 35 3 2 Toepassingswijzen 35 3 3 Opbouw 35 4 Verpakking transport en opslag 37 4 1 Aanlevering 37 4 2 Transport 37 4 3...

Page 27: ...l op de werkplek van het product 1 3 Beoogd gebruik De HOMA producten voldoen aan de geldende veilig heidsregels en de stand der techniek Bij toepassing in strijd met het beoogde gebruik kan er levens...

Page 28: ...chreven onderhouds en inspectiewerkzaam heden moeten regelmatig worden uitgevoerd en mogen uitsluitend door gekwalificeerde en geautoriseerde perso nen worden uitgevoerd Onderhoudswerkzaamheden en elk...

Page 29: ...oor een automa tische uitschakeling van de pomp als de minimale afdek king door water van de pomp wordt onderschreden Dit wordt bijvoorbeeld bereikt door een vlotterschakelaar te installeren Niveaureg...

Page 30: ...of draaistroom De plaatselijke voorschriften moeten worden nageleefd Voor de aansluiting dient het schakelschema in acht te worden genomen De tech nische instructies moeten strikt worden opgevolgd Wan...

Page 31: ...andere vloeistof mag worden toege past Bij installaties die worden gebruikt met een smeer of koelmiddel bijv olie kan dit bij een defecte glijringaf dichting in de vloeistof terechtkomen Gevaar door e...

Page 32: ...rvoer en de leiding zijn drukwaterdicht verzegeld voor de vloeistof De aslagering vindt plaats via robuuste onderhoudsvrije en continu gesmeerde wentellagers Algemene motorgegevens Servicefactor 1 15...

Page 33: ...tegen knikken beschadigingen en binnen dringen van vocht Gevaar door elektrische stroom Door beschadigde stroomtoevoerkabels dreigt le vensgevaar Defecte leidingen moeten onmiddel lijk door een gekwa...

Page 34: ...nt van de pomp onder de toevoerleiding ligt om een terug stuwing van de vloeistof te vermijden Het uitschakel punt moet boven de bovenrand van het pomphuis lig gen zodat er geen luchtbel in de pomp ka...

Page 35: ...Zonder deze controles bestaat er levensgevaar Bij toepassing van licht ontvlambare oplos en reini gingsmiddelen is open vuur open licht en roken ver boden Controleer of het benodigde gereedschap en m...

Page 36: ...ndringen van vocht Machine beschermen tegen direct zonlicht om het gevaar voor verbrossing van elastomere delen en de coating van het huis te voorkomen Let bij opslag in werkplaatsen op het volgende D...

Page 37: ...zich aan flexibele bodem vast Plaats de pomp op een stevige vlakke ondergrond Machine draait maar de opgegeven bedrijfswaarden worden niet aangehouden Oorzaak Oplossing Toevoer verstopt Toevoerleiding...

Page 38: ...38 Notizen Notes...

Page 39: ...39 Notizen Notes...

Page 40: ...edingte Kontaminierung des Ger tes toxisch nein ja welche Stoffe tzend nein ja welche Stoffe mikrobiologisch nein ja welche Stoffe explosiv nein ja welche Stoffe radioaktiv nein ja welche Stoffe sonst...

Page 41: ...the instruments toxic no yes substance corrosive no yes substance microbiological no yes substance explosive no yes substance radioactive no yes substance other substances no yes substance Legally bi...

Page 42: ...tourneren Contaminatie van het apparaat als gevolg van de toepassing giftig nee ja welke stoffen bijtend nee ja welke stoffen microbiologisch nee ja welke stoffen explosief nee ja welke stoffen radioa...

Page 43: ...our other household waste You are liable to dispose of all your electronic or electrical waste equipment by relocating over to the specified collection point for recycling of such hazardous waste Isol...

Page 44: ...x 49 0 2247 702 44 e Mail info homa pumpen de Internet www homa pumpen de Industriestra e 1 53819 Neunkirchen Seelscheid Telefon 49 0 2247 702 0 Fax 49 0 2247 702 44 e Mail info homa pumpen de Interne...

Reviews: