The boiler room must have proper air supply and exhaust ventilation, with air supply located above
boiler's room floor and exhaust ventilation outlet under a ceiling.
Boiler room must have fireproof door, with fire resistance class EI30. The boiler's room door should
be equipped with device allowing them to close automatically. While the boiler is working boiler
room's door should be closed.
Fig. 10 Placement of the Smart Fire boiler in the boiler room
9.3 Chimney system
Due to requirement of low chimney draft, fumes low temperature and possibility that
condensate follow selection of the proper chimney liner is of prime importance!
It is recommended to use ceramic or stainless heat resisting steel chimney liner, which will
provide proper conditions for boiler's work.
Proper connection of boiler smoke conduit to the chimney liner is crucial for proper operation of the
boiler – see figure no.11. The connection must be tight and prevent accumulation and flow of the
condensate into the boiler. Length of the smoke conduit shouldn't be longer than 3 meters,
Smart Fire Manual
wer. 05/07/2012/EN/SL V2.0
HKS LAZAR
str.25
Summary of Contents for SF 21
Page 36: ...13 Declarations and licensing Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 36 ...
Page 37: ...Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 37 ...
Page 38: ...Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 38 ...
Page 39: ...Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 39 ...
Page 40: ...Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 40 ...