•
Correct the boiler settings using the fumes analyser or observing the fumes from the boiler.
It will probably be required to increase the fan power and the fuel supply break.
Fig. 9 Adjustment of air supply holes with use of band
The Smart Fire boiler uses the solid fuels, therefore the noises connected with the combustion
process will be heard.
Smart Fire Manual
wer. 05/07/2012/EN/SL V2.0
HKS LAZAR
str.23
ok
. 6
m
m
Air supply holes
Adjustable band
Band tightening
screw
Ceramic burner
ap
pr
ox
. 6
m
m
Summary of Contents for SF 21
Page 36: ...13 Declarations and licensing Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 36 ...
Page 37: ...Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 37 ...
Page 38: ...Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 38 ...
Page 39: ...Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 39 ...
Page 40: ...Smart Fire Manual wer 05 07 2012 EN SL V2 0 HKS LAZAR str 40 ...