![HKS lazar HTi20 Installation & Operation Manual Download Page 39](http://html1.mh-extra.com/html/hks-lazar/hti20/hti20_installation-and-operation-manual_2141180039.webp)
Description of works
Interval
Bleeding valve closing
During first maintenance
inspection
Product cleaning
Every year
Check of fan and condensate drain
Every year
Check of evaporator
Every year
Check of refrigerant
Every year
Cleaning the magnetic filter
Every year
Checking the operation of the circulation pumps
Every year
Checking the safety valves
Every year
Bleeding valve closing
Every year
7.6.
Heat pump breakdown
Any defect of failure shall be reported immediately to manufacturer. During guarantee period any repairs shall
be provided by HKS LAZAR service or persons authorized by HKS LAZAR service. If delivery of repairs is
not possible on site after arrival of authorized service due to reasons beyond its control (improper installation,
improper heat pump position, power failure, restricted access to device etc.), the user shall incur travel costs
pursuant to HKS LAZAR price list.
Before any repair of identified and reported failure, firstly examination shall be performed regarding a root
cause of failure. Note that most failures were caused by improper parameters, poorly installed sensors, poor
installation. Any defective assembly shall be dismantled and replaced with brand new one.
8. Disposal
As the boiler components are made from various materials, they should be transported to the licensed waste
collection centre to ensure proper disposal and recycling of steel, plastics, etc..
CAUTION- Risk of electric shock!
Any works related to wiring shall be provided by professional fitters only. Before opening guards, firstly
device shall be disconnected from power supply and protected against accidental operation!
Device contains flammable refrigerant!
Any refrigerant leakage poses risk of explosion. Therefore it is required to:
Switch off device
Contact authorized service
Keep safe distance from fire sources.
Any works related to dismantling of heat pump shall be provided by professionals trained in the area of
heating or cooling devices. Disposal of refrigerant, oil and any heat pump components shall be provided
pursuant to applicable regulations regarding recycling and environmental protection. Note that works related
to dismantling shall be delivered by professional familiarized with methods of refrigerant recovery and
disposal. We recommend recovery of the total quantity of refrigerant. Before disposal of refrigerant firstly
tests shall be performed regarding oil and refrigerant.
Familiarize with device operating principle and its functions. .
Disconnect device from power supply.
Operation Manual and Guarantee Card v.010
HKS LAZAR Sp.z o.o. ul. Wodzisławska 15B 44-335 Jastrzębie-Zdrój
page.
39