![HKS lazar HTi20 Installation & Operation Manual Download Page 27](http://html1.mh-extra.com/html/hks-lazar/hti20/hti20_installation-and-operation-manual_2141180027.webp)
Symbol
Contact No
Description
G1
NO1-N
Heater
ZM
N07-N
Circulation 2 mixers - opening
N08-N
Circulation 2 mixers - closing
ZT
NO5-N-L1
Three-way valve
P01
NO4-N-PE
Main pump
P02
NO6-N-PE
Heating circuit pump 1
P03
NO9-N-PE
Heating circuit pump 2
Tz
B1-GND
Supply temp. sensor
TP
B3-GND
Return temp. sensor
T
CWU
B2-GND
Hot water temp. sensor
T2
B7-GND
Flow temperature sensor circuit 2
TP1
B4-GND
Ambient temp. sensor 1
TP2
B5-GND
Ambient temp. Sensor 2
ZT2
N02-N-L1
3-way valve cooling/ heating
K
-
Additional heat source
ZP
-
Differential valve
ZB
-
Safety valve
FM
-
Magnetic filter
A
-
Fancoil
All diagrams are for reference only.
Systems shall be installed according to applicable standards and design specification. Water
system capacity is min. 100L, and min. 50L buffer is recommended.
6. Wiring diagram
6.1.
Wiring connecting external unit and internal one
Connection between the external unit and internal unit is provided with two cables– power supply cable and
communication cable.
Device is delivered along with cables 6 m long.
Any works related to wiring shall be provided pursuant to the following guidelines.
Any works related to wiring shall be provided by professional fitters only.
Before opening guards, firstly device shall be disconnected from power supply and protected
against accidental operation!
Any works related to wiring shall be provided pursuant to the requirements indicated in
applicable regulations.
Always adhere to technical requirements regarding connection indicated by local power plant (is
applicable)!
Check connection of earthing cable to internal and external unit
Operation Manual and Guarantee Card v.010
HKS LAZAR Sp.z o.o. ul. Wodzisławska 15B 44-335 Jastrzębie-Zdrój
page.
27